Mobile Dental Trucks | 18ft, 24ft & 30ft

Non-CDL  ·  Solana™ Solar Standard  ·  ADA Lift Standard

Non-CDL Dental Trucks
for FQHCs and Health Departments

Purpose-built on heavy-duty box truck platforms. Three non-CDL configurations from 18 ft to 30 ft, each with Solana™ solar power delivering 8 hours off-grid and ADA-compliant underchassis lift standard. 8-10 weeks new-build lead time. Deployed by USC Ostrow School of Dentistry, QueensCare Foundation and U.S. Department of Veterans Affairs.

Standard on Every Dental Truck

Truck-Based Mobile Dental Clinic

The Odulair dental truck in 18 ft, 24 ft, or 30 ft configurations supports one or two operatories plus sterilization. 18 ft and 24 ft models are non-CDL. 30 ft requires CDL. Standard ADA hydraulic lift on all trucks. The 30 ft platform supports two private dental operatories or three operatories in an open layout.

1 to 3 Dental Operatories
18 ft supports one operatory. 24 ft supports one or two. 30 ft supports two private operatories or three chairs in an open layout. All configurations include sterilization.
Solana™ Solar — Full Clinical Day Off-Grid
Powers AC, dental equipment, and lighting for a full clinical day without shore power or generator. Engineered into the build, not added as an accessory.
Non-CDL — 18 ft and 24 ft Standard
18 ft and 24 ft configurations require a standard driver license. 30 ft requires CDL. Any licensed driver can operate the non-CDL platforms with no additional training.
OSHA-Compliant Sterilization
Full OSHA-compliant sterilization center standard on 24 ft and 30 ft. Autoclave, instrument processing sink, and sharps management built-in and documented.
ADA Underchassis Hydraulic Lift
Standard on all truck configurations. Powered underchassis lift with no steps, no ramps. Fully ADA-accessible from day one with zero modification at the deployment site.
Digital X-Ray and Full Climate Control
Pre-wired for digital X-ray. Full climate control standard. Oil-free compressor, dry vacuum system, and dedicated dental plumbing on every truck configuration.
See It in Action

Mobile Dental Truck — 3D Walk-Through

18 ft Non-CDL Box Truck

Compact Outreach Truck

Built for urban school programs, rural outreach and single-provider deployments. Standard Ford E-450 or equivalent chassis. No CDL required. Operates on Solana™ solar with 8-hour off-grid capacity and includes ADA underchassis lift as standard.

PlatformBox Truck — Ford E-450 or equivalent
Length18 ft body
CDL RequiredNo — Standard license
Dental Chairs1 chair
Solar PowerSolana™ — 8 hr off-grid
ADA Wheelchair LiftStandard — underchassis
SterilizationCompact autoclave station
Lead Timein 8-10 weeks from signed Sales Agreement
Best for:
School dental programs Rural outreach Single hygienist Urban tight access
18 ft Mobile Dental Truck Interior by Odulair
24 ft Mobile Dental Clinic Truck by Odulair
24 ft Non-CDL Box Truck

FQHC Standard Truck

Most-deployed configuration for federally qualified health centers and county health departments. Supports 1–2 dental chairs with dedicated sterilization, x-ray and patient waiting area. Deployed by USC Ostrow School of Dentistry and U.S. Department of Veterans Affairs programs.

PlatformHeavy-duty box truck chassis
Length24 ft body
CDL RequiredNo — Standard license
Dental Chairs1–2 chairs
Solar PowerSolana™ — 8 hr off-grid
ADA Wheelchair LiftStandard — underchassis
SterilizationFull sterilization station + autoclave
Waiting AreaYes — 2–3 seats
Lead Timein 8-10 weeks from signed Sales Agreement
Best for:
FQHCs County health depts 2-provider programs Grant-funded clinics
Confirmed Deployment
30 ft Non-CDL Box Truck

Flagship Full-Clinic Truck

Most comprehensive truck configuration for multi-chair programs. Two dental chairs, clinical lab, full sterilization center and waiting area. Confirmed deployment with. Operates entirely off-grid for 8 hours on Solana™ solar with lithium battery backup.

Platform30 ft Heavy Box Truck
CDL RequiredNo — Standard license
Dental Chairs2–3 chairs
Solar PowerSolana™ — 8 hr off-grid
ADA Wheelchair LiftStandard — underchassis
Sterilization CenterFull center — dual autoclave
Clinical LabYes
CabinetryAluminum — marine grade
Lead Timein 8-10 weeks from signed Sales Agreement
Request 30 ft Quote →
30 ft Mobile Dental Clinic Truck — configuration
30 ft dental truck interior dental truck sterilization center

Compare All Three Truck Configurations

All trucks are non-CDL, powered by Solana™ solar and equipped with ADA underchassis wheelchair lift as standard.

Feature 18 ft Truck 24 ft Truck 30 ft Truck
CDL Required No No No
Dental Chairs 1 1–2 2–3
Solar (Solana™)
ADA Lift
Full Sterilization Center Compact Dual autoclave
Clinical Lab — Optional
Waiting Area — 2–3 seats 4+ seats

Ready to configure your dental truck?

Our engineering team will spec the exact configuration for your program — chairs, equipment brand, state regulatory requirements and federal contract vehicle options.

Request a Quote →
CAGE 6L2X9  ·  SAM.gov  ·  WOSB  ·  info@odulair.com

See It in Action

Watch Odulair mobile dental clinics delivered, deployed and in clinical operation.

Interior tour — 24ft dental truck

Interior tour — 30ft dental truck

30ft mobile dental clinic truck by Odulair — non-CDL
30ft Non-CDL Mobile Dental Clinic Truck by Odulair

Frequently Asked Questions

Q: What is a mobile dental truck?

A: A mobile dental truck is a box truck chassis (typically 18-30ft) converted into a fully equipped dental clinic, offering more space than a van and simpler logistics than a trailer.

Q: Does a mobile dental truck require a CDL?

A: 18-24ft dental trucks on F-550/F-650 chassis do not require a CDL. 30ft configurations on Hino L7 can be derated to non-CDL. Verify with your state DMV.

Q: How many operatories fit in a mobile dental truck?

A: An 18ft dental truck typically fits 1 operatory. A 30ft configuration can accommodate 2 operatories with a waiting area.

Q: How much does a mobile dental truck cost?

A: Pricing depends on chassis size and clinical configuration. Contact Odulair for a quote.

Q: How long does delivery take?

A: 8-10 weeks from signed Sales Agreement.

Also from Odulair LLC

Odulair also builds mobile clinic trucks and specialty trailers for primary care, dialysis, surgery, and cleanroom applications — mobile cleanroom systems and federal procurement (WOSB · CAGE 6L2X9).

8-10 weeks (53 ft trailers 150-180 days) new-build lead time  ·  WOSB  ·  CAGE 6L2X9  ·  SAM.gov Registered